Job Safety Analysis Sheet ,Job Description: Gas cutting , Sequence Of Basic Job Steps: Planning, Cutting, Windup & Housekeeping, Precautions: Ensure the pipeline / equipment to be gas cut is isolated, depressurized, drained, flushed, and purged as required for safe execution of the job.Wear long sleeved coverall & apron. Use leather hand gloves. Keep First Aid Kit at site. Ensure proper wind up & housekeeping at worksite.The accessories (torch, hoses & cylinders) not being used must be disconnected and stored separately
-
Welcome
The Oil and Gas Industry’s unique legislative and safety requirements require highly specialized technical documentation and training material in order to efficiently operate and maintain its installations.
I am trying to collect and deliver technical documentation and training study material at one platform.
I want to say “Thank You” for visiting this blog and everyone is always welcome to see, visit, subscribe and comment on my blog.
Related Post
- CHECKLISTS (1)
- JSA (25)
- METHOD STATEMENTS (8)
- PLAN (7)
- PROCEDURE (5)
- RISK ASSESSMENT (1)
Manu
POPULAR POST
-
Job Safety Analysis Sheet ,Job Description: Cold cutting , Sequence Of Basic Job Steps: Pre - work , Cold cutting, wind up Work &...
-
MOBILIZATION PLAN 1. INTRODUCTION The intent of this mobilization plan is to represent the general sequence on how the projec...
-
REWARD & PENALTY PROCEDURE ON HSE VIOLATION 1. Introduction Discipline is a critical component of high-functioning safety systems. Use...
-
Job Safety Analysis Sheet, Job Description: De-spading, Sequence Of Basic Job Steps: Pre – Work, Work, Precautions: Plan The Work ...
Labels
- CHECKLISTS (1)
- JSA (25)
- METHOD STATEMENTS (8)
- PLAN (7)
- PROCEDURE (5)
- RISK ASSESSMENT (1)
No comments:
Post a Comment