- Rigging Plan For Heavy Lifting
- sample-2
- JSA-24-DEPLOYMENT OF VACUUM TANKER IN THE HAZARDOUS AREA
- JSA-23-SPRAY PAINTING
- JSA-22-GRIT BLASTING
- JSA-21-FUNCTIONAL TESTING OF FACILITY ALARM
- JSA-20-GAS CUTTING
- JSA-19-HEAVEY LIFTING IN HAZARDOUS AREA
- JSA-18-COLD CUTTING
- JSA-17-PIG RETRIEVAL
- JSA-16-PIG LAUNCHING
- JSA-15-DE-SPADING
- JSA-14-SPADING
- JSA-13-H2S DETECTOR
- JSA-12-FUNCTIONAL TESTING OF FLAME DETECTORS
- JSA-11-FUNCTIONAL TESTING OF FIRE DETECTORS
- JSA-10-REMOVAL /DISMANTLING SCAFFOLDING
- JSA-09-RADIOGRAPHY WORKS
- JSA-08-GAS WELDING
- JSA-06- ERECTION AND USE OF SCAFFOLD
- JSA-06-ELECTRICAL ISOLATION
- JSA-05-ARC WELDING, CUTTING, GRINDING
- JSA-04-CONFINED SPACE ENTRY
- JSA-03-CLEANING A STRAINER ON A PUMP
- JSA- 31-ESD TESTING
- CONFINED SPACE RESCUE PROCEDURE
- REWARD & PENALTY PROCEDURE ON HSE VIOLATION
- Covid-19 Hazard Identification & Risk Assessment
- FALL PROTECTION CHECKLIST
- HYDROGEN SULFIDE MONITORING PROCEDURE
- PROJECT SPECIFIC HSE PLAN
- PROJECT SECURITY MANAGEMENT PLAN
- PROJECT EXECUTION PLAN
- MOBILIZATION PLAN
- TRAFFIC MANAGEMENT PLAN
- WORK PERMIT SYSTEM
- PROCUREMENT PROCEDURE
- HSE TRAINING PLAN
- METHOD STATEMENT FOR PIPE SUPPORT FABRICATION & INSTALLATION
- GENERAL METHOD STATEMENT FOR FOUNDATIONS
- METHOD STATEMENT FOR NATURAL GAS PIPELINE INSTALLATION
- METHOD STATEMENT FOR SPOOL FABRICATION OF STEEL PIPING
- METHOD STATEMENT FOR FABRICATION WORKS STRUCTURAL STEEL
- MS FOR OFFICE CONTAINER & EQUIPMENT MOBILIZATION & DEMOBILIZATION
- METHOD STATEMENT FOR CONCRETE CASTING
- METHOD STATEMENT FOR WELDING IN WORKSHOP
- JSA-01 MANUAL EXCAVATION
- JSA-02 FOR MECHANICAL EXCAVATION
-
Welcome
The Oil and Gas Industry’s unique legislative and safety requirements require highly specialized technical documentation and training material in order to efficiently operate and maintain its installations.
I am trying to collect and deliver technical documentation and training study material at one platform.
I want to say “Thank You” for visiting this blog and everyone is always welcome to see, visit, subscribe and comment on my blog.
Related Post
- CHECKLISTS (1)
- JSA (25)
- METHOD STATEMENTS (8)
- PLAN (7)
- PROCEDURE (5)
- RISK ASSESSMENT (1)
Manu
POPULAR POST
-
MOBILIZATION PLAN 1. INTRODUCTION The intent of this mobilization plan is to represent the general sequence on how the projec...
-
Job Safety Analysis Sheet ,Job Description: Cold cutting , Sequence Of Basic Job Steps: Pre - work , Cold cutting, wind up Work &...
-
REWARD & PENALTY PROCEDURE ON HSE VIOLATION 1. Introduction Discipline is a critical component of high-functioning safety systems. Use...
-
1. PURPOSE The purpose of this method statement is to provide a standard for the fabrication of steel piping constructed at Project. T...
Labels
- CHECKLISTS (1)
- JSA (25)
- METHOD STATEMENTS (8)
- PLAN (7)
- PROCEDURE (5)
- RISK ASSESSMENT (1)
Subscribe to:
Posts (Atom)
No comments:
Post a Comment