Job Safety Analysis
Sheet ,Job Description: Functional
Testing Of Facility Alarm, Sequence Of Basic Job
Steps:
Planning, Functional Testing, Windup &
Housekeeping, Precautions: Ensure the spare items such as bulbs,
fuse, resistance etc. are available for replacement of
defective items. Refer manufacturer instruction for
replacement of bulb or other items. Inform
the workers in the facility prior to
functional testing of alarm system. Ensure
the identity of Sounder & Beacon
through Tag No.
-
Welcome
The Oil and Gas Industry’s unique legislative and safety requirements require highly specialized technical documentation and training material in order to efficiently operate and maintain its installations.
I am trying to collect and deliver technical documentation and training study material at one platform.
I want to say “Thank You” for visiting this blog and everyone is always welcome to see, visit, subscribe and comment on my blog.
Related Post
- CHECKLISTS (1)
- JSA (25)
- METHOD STATEMENTS (8)
- PLAN (7)
- PROCEDURE (5)
- RISK ASSESSMENT (1)
Manu
POPULAR POST
-
Job Safety Analysis Sheet ,Job Description: Cold cutting , Sequence Of Basic Job Steps: Pre - work , Cold cutting, wind up Work &...
-
MOBILIZATION PLAN 1. INTRODUCTION The intent of this mobilization plan is to represent the general sequence on how the projec...
-
REWARD & PENALTY PROCEDURE ON HSE VIOLATION 1. Introduction Discipline is a critical component of high-functioning safety systems. Use...
-
Job Safety Analysis Sheet, Job Description: De-spading, Sequence Of Basic Job Steps: Pre – Work, Work, Precautions: Plan The Work ...
Labels
- CHECKLISTS (1)
- JSA (25)
- METHOD STATEMENTS (8)
- PLAN (7)
- PROCEDURE (5)
- RISK ASSESSMENT (1)