Job Safety Analysis Sheet ,Job Description: Cold cutting , Sequence Of Basic Job Steps: Pre - work, Cold cutting, wind up Work & Housekeeping, Precautions: Ensure the pipeline / equipment to be cold cut is isolated, depressurized,drained, flushed, or purged as required for safe execution of the job. Do not touch the portion being cut. Use Suitable hand gloves (such as Leather. Stop the cold cutting immediately in case of leak / spill from the pipe being cut. Use properly insulated & suitably rated cables & extension wire for powered tools. Ensure proper wind up & housekeeping at worksite. The accessories (tools, cables & sockets / terminals) not being used must be disconnected and stored separately.
-
Welcome
The Oil and Gas Industry’s unique legislative and safety requirements require highly specialized technical documentation and training material in order to efficiently operate and maintain its installations.
I am trying to collect and deliver technical documentation and training study material at one platform.
I want to say “Thank You” for visiting this blog and everyone is always welcome to see, visit, subscribe and comment on my blog.
Related Post
- CHECKLISTS (1)
- JSA (25)
- METHOD STATEMENTS (8)
- PLAN (7)
- PROCEDURE (5)
- RISK ASSESSMENT (1)
Manu
POPULAR POST
-
Job Safety Analysis Sheet ,Job Description: Cold cutting , Sequence Of Basic Job Steps: Pre - work , Cold cutting, wind up Work &...
-
MOBILIZATION PLAN 1. INTRODUCTION The intent of this mobilization plan is to represent the general sequence on how the projec...
-
REWARD & PENALTY PROCEDURE ON HSE VIOLATION 1. Introduction Discipline is a critical component of high-functioning safety systems. Use...
-
Job Safety Analysis Sheet, Job Description: De-spading, Sequence Of Basic Job Steps: Pre – Work, Work, Precautions: Plan The Work ...
Labels
- CHECKLISTS (1)
- JSA (25)
- METHOD STATEMENTS (8)
- PLAN (7)
- PROCEDURE (5)
- RISK ASSESSMENT (1)
No comments:
Post a Comment