Job Safety Analysis Sheet ,Job Description: Cold cutting , Sequence Of Basic Job Steps: Pre - work, work, wind up Work & Housekeeping, Precautions: Plan the work involving personnel responsible for preparation (isolation, depressurization, draining, flushing, purging etc.) of the pipeline from which pig is to retrieved. Review Scope of Work & step by step procedure. Obtain the required work permit Conduct Tool Box Talk. Identify the valve to be closed referring P & ID. Ensure the valves are closed fully. Use Lock & Tag Depressurize the pig barrel to safe location. Drain the liquid content to trap / sump / safe location. Confirm the absence of pressure by opening a vent to safe location as well as observe pressure gauges reading. Flush the pig barrel with water for possible presence of Phosphoric deposit. Asses the risk & Override gas detectors in case required. Carry out gas test for safe working area. Confirm isolation valve integrity by slight opening the nearest vent / drain point. Confirm the absence of pressure at least from 2 independent sources (e.g. pressure gauges fixed at different location of pig barrel). Use non sparking tools in hazardous location. Keep Fire Extinguishers & fire hose in ready condition. Purge with nitrogen (if required) to remove toxic content. Use air line unit if required. Use safety goggles & Face Shield. Loosen the bolts / studs slowly. Do not stand in front of pig barrel door while opening it.Ensure the closure of pig barrel door after retrieving the pig. Ensure the closure of all vents & drain valves after closing the pig barrel door.Ensure the normalization of all valves including vent, drain, pressure gauges, gas detectors, liquid trap etc. Ensure proper housekeeping of the area.
-
Welcome
The Oil and Gas Industry’s unique legislative and safety requirements require highly specialized technical documentation and training material in order to efficiently operate and maintain its installations.
I am trying to collect and deliver technical documentation and training study material at one platform.
I want to say “Thank You” for visiting this blog and everyone is always welcome to see, visit, subscribe and comment on my blog.
Related Post
- CHECKLISTS (1)
- JSA (25)
- METHOD STATEMENTS (8)
- PLAN (7)
- PROCEDURE (5)
- RISK ASSESSMENT (1)
Manu
POPULAR POST
-
Job Safety Analysis Sheet ,Job Description: Cold cutting , Sequence Of Basic Job Steps: Pre - work , Cold cutting, wind up Work &...
-
MOBILIZATION PLAN 1. INTRODUCTION The intent of this mobilization plan is to represent the general sequence on how the projec...
-
REWARD & PENALTY PROCEDURE ON HSE VIOLATION 1. Introduction Discipline is a critical component of high-functioning safety systems. Use...
-
Job Safety Analysis Sheet, Job Description: De-spading, Sequence Of Basic Job Steps: Pre – Work, Work, Precautions: Plan The Work ...
Labels
- CHECKLISTS (1)
- JSA (25)
- METHOD STATEMENTS (8)
- PLAN (7)
- PROCEDURE (5)
- RISK ASSESSMENT (1)
No comments:
Post a Comment